首页 >> 试验机案例 >> JG/T 503-2016承插型盘扣式钢管支架构件连接盘双侧弯剪强度试验Double Shear Strength Test
JG/T503-2016承插型盘扣式钢管支架构件连接盘双侧弯剪强度试验:对Z型产品连接盘部位双侧加载,第1次加载由0kN加至6kN后卸载;第2次加载由0kN加载至21kN持荷2min,连接盘各部位不应破坏。对B型产品连接盘部位双侧加载,第1次加载由0kN加载至4kN后卸载;第2次加载由0kN加载至14kN持荷2min,试件各部位不应破坏。
200kN盘扣式钢管支架构件试验机,测试脚手架连接盘单侧抗剪强度、连接盘双侧抗剪强度、双侧弯剪强度、连接盘抗弯强度、连接盘抗拉强度、连接盘内侧环焊缝抗剪强度、可调托撑和可调底座抗压强度试验;60.3mm盘扣式脚手架试验机;jnshiyanji;48.3mm承插型脚手架试验机;PKJ承插型盘扣式钢管支架构件试验机;100kN钢管脚手架扣件试验机;120kN碗扣式钢管脚手架构件试验机;300kN门式钢管脚手架试验机;脚手架上碗扣强度试验、下碗扣焊接强度试验、横杆接头强度试验、横杆接头焊接强度试验、KDZ可调支座抗压强度试验;hrjtest;脚手架直角扣件抗滑性能试验、抗破坏性能试验、扭转刚度性能试验,旋转扣件抗滑性能试验、抗破坏性能试验,对接扣件抗拉性能试验,底座抗压性能试验;弯曲试验力-位移曲线;200kN重型钢管支架强度试验机;轻型钢管支架强度试验机;33.7mm钢管支架力学强度试验机;38mm钢管支架强度试验机;42.4mm钢管支架力学试验机;EN 74;DIN 39;BS 1139;GB 15831;GB24911;jnshiyanji;JGJ231;JG/T503-2016;JGJ130-2011;GJ166-2016;GB/T3091-2015;JC/T2287-2014;DL/T1209.4-2014;JGJ128-2010;GB 24910;CB 4204-2012;SH/T3555-2014;
Connect Plate Double Shear Strength Test;Scaffolding Connect Plate Shear Strength Tester;Steel Tube Scaffold Couplers Tester;Bowl-coupler Type Steel Tube Scaffolding Member Tester;Disk Lock Steel Tubular Scaffold Components Tester;Tubular Steel Frame Scaffolding Tester;Door-type Steel Pipe Scaffolding Tester;Bend Test Force-Displacement Curve;hrjtest;Scaffolding couplers Tester;Metal Scaffolding Tester;jnshiyanji;Frame Scaffolding Tester;right angle coupler test;swivel coupler test;sleeve coupler test;base-plate test;U-jack test;coupler joint test;standing tube test;crown tube test;slanting support test;supports test;jack support test;Steel tube scaffold couplers;disk lock steel tubular scaffold in construction;hrjtest;steel tubular scaffold with couplers in construction;frame scaffoldings with Buckles Bowl in construction;Welded steel pipes for low pressure liquid delivery;germane version;hrjtest;Loose steel tubes;tube and coupler scaffolds-Technical delivery conditions;Couplers spigot pins and base plates;use in false work and scaffolds;hrjtest;Special couplers-Requirements and test procedures;quick-erectable mobile scaffolding;prefabricated elements;Specifications for substation ascending operation and protective device;composite quick-installed scaffold;safety of frame scaffoldings with steel tubules in construction;Technical specification for construction safety;steel scaffold building in petrochemical industry;tubes-Requirements and test procedures;Steel plate punched coupler;
济南恒瑞金试验机有限公司;钢管脚手架构件强度试验机;力值硬度计量专业委员
(试验机服务中心)(试验机配件供应中心)(特殊夹具定制中心)
|